Pedestrian Bridge Work Begins

Beginning Wednesday, May 24, contractors will start repairing the pedestrian bridge. The work/repair will cause us to close New Campus Drive between Drake and Tuttle with detouring traffic around the Tuttle/SERC Complex.

Pedestrian traffic on the bridge will be available during this time as the contractor will hard wall off their work areas during reconstruction. We anticipate this work taking up to two weeks for completion.

Thank you in advance for your cooperation during this summer repair.

Back to Brockport Today

Contact:

Bill McGorray (wmcgorra@brockport.edu)

Posted: May 23, 2023